Complete metal-to-metal re-roofing project featuring Kliplok profile Colorbond sheets. Work included removal of existing roof, installation of top hat battens, wool sarking blanket for thermal and acoustic insulation, and safety mesh installation to Australian standards.
The project incorporated 450mm commercial whirlybirds for superior ventilation, custom-made flashings including parapet capping, and all associated fixings. Roof rails were installed for safe future access, with working at heights protocols strictly followed throughout the installation.
Delivered a premium metal roofing system with enhanced thermal performance and noise reduction. The Kliplok profile ensures weather-tight protection while the wool sarking provides year-round comfort. All rubbish removal included, leaving the property immaculate upon completion.




Extensive roof restoration project completed despite challenging weather conditions. Work was carefully managed around 13 rain and high-wind delays to ensure safety and quality. All work performed to strict safety protocols with multiple call-offs due to hazardous conditions.
Project required exceptional coordination and patience, with work stopped whenever winds or rain created safety hazards. Our team maintained flexibility with scheduling while ensuring every stage met safety standards. Careful monitoring of weather forecasts allowed us to maximize productive work periods.
Successfully completed comprehensive roof restoration despite significant weather interruptions spanning May through June. The project demonstrates our commitment to safety-first practices and our ability to deliver quality results even under challenging conditions. Client's property remained protected throughout the extended timeline.




Complex roofing project involving complete removal of existing plywood substrate and installation of James Hardie 19mm Scyon Secura compressed fibre cement sheeting. Eclipse Snap Lock 25mm rib profile roof sheets installed with precision over new Top Hat battens at 600mm centres.
Work included careful removal and disposal of old flashing and substrate, followed by installation of 1.20 BMT battens to required specifications. The front façade flashing was maintained like-for-like with overhang battens for proper fixing. All flashings and fixings supplied and installed to specification.
New gutter system with half-round profile, exterior brackets and end caps completed the transformation. The Snap Lock profile provides a clean, modern aesthetic with superior weather protection. Project delivered a robust, long-lasting roofing system built to Australian standards.




Comprehensive 820m² metal-to-metal re-roofing project in Bluegum Colorbond with Forest Blue gutters. Work included complete roof removal, top hat batten installation, wool sarking blanket, and safety mesh. Four 450mm industrial whirlybirds installed for optimal ventilation.
Project featured 20m² of custom orb wall cladding replacement on gable ends, including all fixtures. Complete gutter replacement with 83m of 150mm half-round guttering and matching downpipes. All flashings custom-made to suit the installation, ensuring perfect weather-tight integration.
Delivered a complete roofing transformation combining premium Colorbond metal roofing, enhanced ventilation, and complementary wall cladding. The two-tone color scheme in Bluegum and Forest Blue provides striking visual appeal. All work completed to Australian standards with comprehensive warranties.




Specialized high-rise gutter replacement project requiring two installers on harness at all times. Complete removal of 88LM of existing gutters, safely transported down fire stairs in small pieces. Square-type gutters with 125mm high back installed for superior water management.
Critical nib wall preparation included clearing all timber and debris, followed by waterproofing using DURHAM 195 polyurethane UV-resistant membrane to prevent weather-related water ingress. Torched-on waterproofing cut back 100mm and new membrane lapped into gutters for seamless water flow.
Successfully completed complex working-at-heights installation with comprehensive safety protocols. Plywood working areas established, barrier tape and safety equipment deployed throughout. The new waterproofed system with high-back gutters provides exceptional protection against water damage for this exposed property.