Completed Roofing Projects

    Completed Roofing Projects

    Explore our portfolio of successful roofing projects across Sydney. From emergency repairs to complete roof replacements, see how our expertise and commitment to quality deliver exceptional results for every client.

    Our Recent Roofing Projects

    Discover the quality and craftsmanship that defines our roofing services. Each project showcases our commitment to excellence and customer satisfaction.

    Metal Re-Roof with Kliplok Profile - Project 1Metal Re-Roof with Kliplok Profile - Project 2
    Metal Re-Roof with Kliplok Profile - Project 3Metal Re-Roof with Kliplok Profile - Project 4
    2025

    Metal Re-Roof with Kliplok Profile

    Complete metal-to-metal re-roofing project featuring Kliplok profile Colorbond sheets. Work included removal of existing roof, installation of top hat battens, wool sarking blanket for thermal and acoustic insulation, and safety mesh installation to Australian standards.

    The project incorporated 450mm commercial whirlybirds for superior ventilation, custom-made flashings including parapet capping, and all associated fixings. Roof rails were installed for safe future access, with working at heights protocols strictly followed throughout the installation.

    Delivered a premium metal roofing system with enhanced thermal performance and noise reduction. The Kliplok profile ensures weather-tight protection while the wool sarking provides year-round comfort. All rubbish removal included, leaving the property immaculate upon completion.

    Sylvania, Southern Sydney
    5-7 days
    Completed 2025
    Weather-Challenged Roof Restoration - Project 1Weather-Challenged Roof Restoration - Project 2
    Weather-Challenged Roof Restoration - Project 3Weather-Challenged Roof Restoration - Project 4
    2025

    Weather-Challenged Roof Restoration

    Extensive roof restoration project completed despite challenging weather conditions. Work was carefully managed around 13 rain and high-wind delays to ensure safety and quality. All work performed to strict safety protocols with multiple call-offs due to hazardous conditions.

    Project required exceptional coordination and patience, with work stopped whenever winds or rain created safety hazards. Our team maintained flexibility with scheduling while ensuring every stage met safety standards. Careful monitoring of weather forecasts allowed us to maximize productive work periods.

    Successfully completed comprehensive roof restoration despite significant weather interruptions spanning May through June. The project demonstrates our commitment to safety-first practices and our ability to deliver quality results even under challenging conditions. Client's property remained protected throughout the extended timeline.

    Matraville, Eastern Suburbs
    6 weeks (May-June)
    Completed 2025
    Snap Lock Roof & Substrate Replacement - Project 1Snap Lock Roof & Substrate Replacement - Project 2
    Snap Lock Roof & Substrate Replacement - Project 3Snap Lock Roof & Substrate Replacement - Project 4
    2024

    Snap Lock Roof & Substrate Replacement

    Complex roofing project involving complete removal of existing plywood substrate and installation of James Hardie 19mm Scyon Secura compressed fibre cement sheeting. Eclipse Snap Lock 25mm rib profile roof sheets installed with precision over new Top Hat battens at 600mm centres.

    Work included careful removal and disposal of old flashing and substrate, followed by installation of 1.20 BMT battens to required specifications. The front façade flashing was maintained like-for-like with overhang battens for proper fixing. All flashings and fixings supplied and installed to specification.

    New gutter system with half-round profile, exterior brackets and end caps completed the transformation. The Snap Lock profile provides a clean, modern aesthetic with superior weather protection. Project delivered a robust, long-lasting roofing system built to Australian standards.

    Millers Point, Sydney CBD
    4-5 days
    Completed 2024
    Complete Re-Roof, Gutters & Wall Cladding - Project 1Complete Re-Roof, Gutters & Wall Cladding - Project 2
    Complete Re-Roof, Gutters & Wall Cladding - Project 3Complete Re-Roof, Gutters & Wall Cladding - Project 4
    2025

    Complete Re-Roof, Gutters & Wall Cladding

    Comprehensive 820m² metal-to-metal re-roofing project in Bluegum Colorbond with Forest Blue gutters. Work included complete roof removal, top hat batten installation, wool sarking blanket, and safety mesh. Four 450mm industrial whirlybirds installed for optimal ventilation.

    Project featured 20m² of custom orb wall cladding replacement on gable ends, including all fixtures. Complete gutter replacement with 83m of 150mm half-round guttering and matching downpipes. All flashings custom-made to suit the installation, ensuring perfect weather-tight integration.

    Delivered a complete roofing transformation combining premium Colorbond metal roofing, enhanced ventilation, and complementary wall cladding. The two-tone color scheme in Bluegum and Forest Blue provides striking visual appeal. All work completed to Australian standards with comprehensive warranties.

    Thornleigh, Upper North Shore
    7-10 days
    Completed 2025
    High-Rise Gutter Replacement with Waterproofing - Project 1High-Rise Gutter Replacement with Waterproofing - Project 2
    High-Rise Gutter Replacement with Waterproofing - Project 3High-Rise Gutter Replacement with Waterproofing - Project 4
    2024

    High-Rise Gutter Replacement with Waterproofing

    Specialized high-rise gutter replacement project requiring two installers on harness at all times. Complete removal of 88LM of existing gutters, safely transported down fire stairs in small pieces. Square-type gutters with 125mm high back installed for superior water management.

    Critical nib wall preparation included clearing all timber and debris, followed by waterproofing using DURHAM 195 polyurethane UV-resistant membrane to prevent weather-related water ingress. Torched-on waterproofing cut back 100mm and new membrane lapped into gutters for seamless water flow.

    Successfully completed complex working-at-heights installation with comprehensive safety protocols. Plywood working areas established, barrier tape and safety equipment deployed throughout. The new waterproofed system with high-back gutters provides exceptional protection against water damage for this exposed property.

    Rushcutters Bay, Eastern Suburbs
    5-6 days
    Completed 2024

    Our Latest Projects

    Discover our recent roofing transformations. Move your mouse over each image to see the amazing before and after results.

    Emergency Roof Repairs - Before
    Emergency Roof Repairs - After
    Drag handle
    Before
    After
    Emergency Service

    Emergency Roof Repairs

    Sydney, NSW
    Roof Restoration Project - Before
    Roof Restoration Project - After
    Drag handle
    Before
    After
    Restoration

    Roof Restoration Project

    North Shore, NSW
    Metal Roof Installation - Before
    Metal Roof Installation - After
    Drag handle
    Before
    After
    New Installation

    Metal Roof Installation

    Eastern Suburbs, NSW
    Complete Roof Replacement - Before
    Complete Roof Replacement - After
    Drag handle
    Before
    After
    Full Replacement

    Complete Roof Replacement

    Inner West, NSW
    Roof Painting Transformation - Before
    Roof Painting Transformation - After
    Drag handle
    Before
    After
    Painting

    Roof Painting Transformation

    Western Sydney, NSW
    Heritage Roof Restoration - Before
    Heritage Roof Restoration - After
    Drag handle
    Before
    After
    Heritage Work

    Heritage Roof Restoration

    CBD, NSW
    Commercial roof repairs background

    Need Reliable Roofers? Get a Free Quote Today

    From urgent make-safes to scheduled remedial works, we deliver clear scopes, photo documentation and workmanship warranties, keeping your operations safe and minimising downtime.